Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.
City Hall is open 7:30 a.m. – 5:30 p.m. Monday through Thursday and 8:00 a.m. – 5:00 p.m. on Fridays.
City Council Meeting are held in the City Council Chambers upstairs in City Hall located at 116 W. Bridge St. They are usually held on the first and third Tuesdays of each month. The meetings are open to the public, and start at 6 p.m.
The Visitors Center is located in Granbury Square Plaza at 201 E Pearl St. #101 (the corner of Pearl and Crockett). The Visitors Center hours are Monday through Thursday 10 a.m. to 5 p.m. Friday and Saturday 10 a.m. to 6 p.m. Sunday 12:30 p.m. to 4:30 p.m.
The Visitors Center phone number is 817-573-5548. For more information, go to www.visitgranbury.com .
Although US Highway 377 is in Granbury, it is not a City of Granbury road. The Texas Department of Transportation (TxDOT) is responsible for the maintenance of US Highway 377. Granbury's Mayor, Councilmembers and Staff are frequently in contact with State and Federal elected officials and TxDOT staff, seeking new information and faster timetables regarding highway improvements.
Here are some of the milestones in the project, most recent first.
February 4, 2025 Granbury City Council considers adopting Resolution No. 25-05 evidencing support of the proposed aesthetics and the respective cost on the US Highway 377 "Breakout Project". WATCH THE VIDEO Aesthetics Manual
June 2023 US 377 Texas Corridor Update (.pdf)
TxDOT hosted a virtual public hearing with in-person option about US 377 in Granbury. Details at this link: https://www.txdot.gov/projects/hearings-meetings/fort-worth/us377-in-hood-county.html?fbclid=IwAR2_oCPD-fl484pv35mgADQg_JkmPLoBGzXAge3hpQBEO83ud8q8KZICOug
CLICK HERE FOR THE JUNE 13, 2023 MEETING VIDEO
CLICK HERE FOR THE PRESENTATION AND PRESENTATION SCRIPT
US 377 in Granbury from Holmes Drive to North of FM 167 (Fall Creek Highway) VIDEO LINK
US 377 at SH 144 Diverging Diamond Interchange Visualization VIDEO LINK
Here are the June 13, 2023 meeting documents:
Environmental documents (red text are links) Traffic noise analysis report Community impact report Species analysis Species spreadsheet Archeology background study Archeology survey report Hazardous materials assessment Surface water analysis Historical studies Project coordination request for historical studies project
Public Hearing Displays-the following Schematic documents are at https://www.txdot.gov/projects/hearings-meetings/fort-worth/us377-in-hood-county.html?fbclid=IwAR2_oCPD-fl484pv35mgADQg_JkmPLoBGzXAge3hpQBEO83ud8q8KZICOug
Schematic 1 – US 377 from south of Holmes Drive to south of Pirate Drive
Schematic 2 – US 377 from south of Pirate Drive to north of Brazos River Bridge
Schematic 3 – US 377 from north of Brazos River Bridge to north of Harbor Lakes Drive
Schematic 4 – US 377 from north of Harbor Lakes Drive to north of Old Granbury Road
Schematic 5 – US 377 from north of Old Granbury Road to south of FM 4/Meander Road
Schematic 6 – US 377 from south of FM 4/Meander Road to north of FM 167 (Temple Hall Highway)
Schematic 7 – US 377 from north of FM 167 (Temple Hall Highway) to north of FM 167 (Fall Creek Highway)
Schematic 8 – US 377 north of FM 167 (Fall Creek Highway)
Breakout project – US 377 from Pirate Drive to Overstreet Blvd
**********************************
TxDOT hosted a "US 377 in Hood County" Virtual public meeting with in-person option on Thursday, Nov. 17. These are the items released by TxDOT at the meeting.
VIDEO: TxDOT's US 377 in Granbury, Virtual public meeting (link)
VIDEO: TxDOT Animation for Proposed Interchange-US 377 at SH 144 (link)
DOCUMENT: Environmental Constraints Map (link)
DOCUMENT: Slide Presentation (link) Script for the Slide Presentation (link)
DOCUMENTS: Schematics (links)
Schematic 1 – US 377 from Holmes Drive to Pirate Drive
Schematic 2 – US 377 from Pirate Drive to End of the Brazos River Bridge
Schematic 3 – US 377 from End of the Brazos River Bridge to Harbor Lakes Drive
Schematic 4 – US 377 from Harbor Lakes Drive to Old Granbury Road
Schematic 5 – US 377 from Old Granbury Road to FM 4
Schematic 6 – US 377 from FM 4 to FM 167 (Temple Hall Highway)
Schematic 7 – US 377 from FM 167 (Temple Hall Highway) to FM 167 (Fall Creek Highway)
Schematic 8 – US 377 from FM 167 (Fall Creek Highway) to End of Project Limits
Breakout Project – US 377 from Pirate Drive to Overstreet Boulevard
TxDOT Fort Worth District is proposing improvements to US 377 from Holmes Drive to 3,000 feet north of FM 167 (Fall Creek Highway), a distance of approximately 9 miles, in the City of Granbury, Hood County, Texas. The project has the potential to be constructed in phases, with improvements to US 377 between Pirate Drive and Overstreet Boulevard, including the US 377 interchanges with FM 51 and SH 144, being completed during the first phase of construction.
US 377 between Holmes Drive and SH 144 would remain a four-lane highway and would be converted from a rural highway to an urban highway through the addition of a raised median, enclosed drainage and curbs where appropriate.
The proposed project would:
-Reconstruct and widen US 377, from SH 144 to north of FM 167 (Fall Creek Highway), from a four-lane divided highway to a six-lane divided highway with a raised median that would either be concrete-paved or vegetated to provide opportunities for landscaping
-Add improvements to cross street intersections, ramps and driveway connections
-Add shared-use paths in each direction to accommodate bicyclists and pedestrians, signalization, and drainage improvements
Improve driveway connections that are also proposed at Meadows Drive, Whitehead Drive, Calinco Drive, Warnick Court/CR 331, Granbury Court, and Corporate Drive
The proposed project would require 26 acres of new ROW and 3.4 acres of permanent drainage easements.
For TxDOT's "Project Tracker," please go to https://apps3.txdot.gov/apps-cq/project_tracker/ You can search "Hood-County" for localized results.
For more information, click on TxDOT's US 377 Project page at: https://www.txdot.gov/inside-txdot/projects/studies/fort-worth/us377-granbury.html
TxDOT's 2023 Unified Transportation Program, a record $85 billion, 10-year statewide roadway construction plan is at this link: https://ftp.txdot.gov/pub/txdot/tpp/utp/utp-2023.pdf (Large file) Hood County information begins at page 88 of the document
For a guide to "Who are your State Senators, State Representatives, U.S. Senators and U.S. Representatives?" CLICK HERE